Introduction
Scheduled maintenance is vital for optimal utilization, availability and performance of the resources in your IT environment.
- It includes software updates, system patches, database maintenance, hardware checks, planned shutdown, etc.
- It helps you mitigate unexpected outages, disruptions, equipment failure. It involves planned activities to ensure security, reliability, and optimal performance of the resources.
- Scheduled maintenance may be a one-time task or a recurring one.
Create and manage scheduled maintenance on the managed resources in your IT environment.
Following are the actions you can perform on a scheduled maintenance:
- Create - Create a scheduled maintenance.
- View - View the scheduled maintenance details.
- Edit - Edit pending scheduled maintenance.
- Create Copy - Create a copy of an existing scheduled maintenance.
- Suspend - Suspend an active scheduled maintenance.
- End - End an active scheduled maintenance window.
- Resume - Resume a suspended maintenance window.
- Remove - Remove a pending or completed maintenance window.
Note
- Device Manage and Scheduled Maintenance Manage permissions are needed to create a scheduled maintenance.
- Device View and Scheduled Maintenance View permissions are needed to view a scheduled maintenance.
Create a scheduled maintenance
Follow these steps to create a scheduled maintenance:
Navigate to Setup > Account. The Account Details page is displayed.
Click the Scheduled Maintenance tile.
Click on +Add from the Scheduled Maintenance page.
Enter the following details under Assigned Resources:
- All Resources: Select this option if you want to assign all the resources in the client.
- Selected Resources: Select this option if you want to manually assign resources. Scheduled maintenance will be created for all the selected resources.
You can use any of the options - Manually Assigned Resources, Resource Groups, or Sites, or a combination of them.- Manually Assigned Resources: Select the resources from the dropdown. You can also use the Advanced Search link to select resources:
- Click the Advanced Search link and click on +Query and build a query.
- Select the resources and click on Apply Selection.
Note: A maximum of 50 resources can be selected.
- Resource Groups: Select the resource group(s) from the dropdown.
Note: A maximum of 50 groups can be selected. - Sites: Select the site(s) from the dropdown.
Note: A maximum of 50 sites can be selected.
- Manually Assigned Resources: Select the resources from the dropdown. You can also use the Advanced Search link to select resources:
Enter the following details under Maintenance Window Details:
- Name: Enter a scheduled maintenance name.
- Description: Enter the reason for the maintenance.
- Schedule: Select the required schedule recurrence and enter the details:
- One-time
- Daily
- Weekly
- Monthly
- Settings: Select the required option(s).
Click on Add Maintenance Window. The Scheduled Maintenance is created and displayed on the Scheduled Maintenance listing page.
Use the search box to search for the newly created Scheduled Maintenance.
The Scheduled Maintenance listing page displays the following information:
| Column Name | Description |
|---|---|
| Name | Scheduled Maintenance name. |
| Description | Description of the Scheduled Maintenance. Displays a clock tooltip. Hover over the tooltip to view the schedule information. |
| Resources | Number of resources assigned to the scheduled maintenance. Click on the number to view the details. |
| Resource Groups | Number of resource groups assigned to the scheduled maintenance. Click on the number to view the details. |
| Sites | Number of sites assigned to the scheduled maintenance. Click on the number to view the details. |
| Alert Conditions | Displays Yes if any alert condition is defined. Displays No if no alert condition is defined. |
| Escalate Alerts | Displays Yes if the option to escalate maintenance alerts when window ends is selected during the schedule maintenance creation process. |
| Correlate Alerts | Displays Yes if the option to Correlate all open alerts when window ends is selected during the schedule maintenance creation process. |
Actions on scheduled maintenance
Below are the actions you can perform on a scheduled maintenance.
| Action | Description |
|---|---|
| View Details | To view scheduled maintenance details:
|
| Create Copy | To create a copy:
|
| Edit | Note: You can edit only pending scheduled maintenance. To edit:
|
| Suspend | You can suspend an active scheduled maintenance. To suspend:
|
| End | You can end an active scheduled maintenance. To end:
|
| Resume | You can resume a suspended maintenance window. To resume:
|
| Remove | You can remove a pending or completed maintenance window. To remove:
|